冷卻塔安裝要求

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應根據(jù)設備的各種條件,考慮其安裝位置的地面及其荷載能力,同時也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時應注意冷卻塔的基礎按規(guī)定的尺寸預埋好水平鋼板,各基礎點的標高應在同一標高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應放置水平。水塔在施工安裝時,為防止壓壞底盤,施工人員應踏在底盤的加強筋上,在安裝塔外殼、底盤等纖維件時,為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認底盤不變形,附近干凈、干燥的條件下,為避免使用時漏水可在接觸處鋪設纖維氈及涂樹脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風不良和出現(xiàn)濕空氣回流的場合,須安裝在通風良好的場所。否則將會降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時,應根據(jù)施工圖指明的坐標位置就位,并應找平找正,設備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.

相關產(chǎn)品 我們的存在,是為了更好的服務于沼氣等可燃氣體凈化及利用行業(yè)
囗交姿势图3d效果展示图| 交而不泄的方法| 老师黑色双开真丝旗袍| 国产jazz亚洲护士无码| 日本免费观看| 寡妇bwwbwwbww| 猛烈顶弄h禁欲医生h怀孕| 精品人妻伦一二三区久久| av电影在线观看| 日产无人区一线二线三线| 岳故意装睡让我挺进去观看| 美国式禁忌3| 大内密探零零性性| 小箩莉h文合集小说| www.五月天| av高潮喷水一区二区三区| 我和小娻孑在卧室做了| 国产日产亚洲系列最新| 亚洲欧美一区二区三区在线| 欧美性猛交xxxx乱大交3| 真人性囗交69视频| 狠狠色婷婷久久综合频道毛片| 欧美激情一区二区三区| 再深点灬舒服灬太大了添a片小说| 卧底女警张腿迎合交换献身| 扒开粉嫩小泬白浆20p| 24小时在线看免费观看直播| 18禁黄网站男男禁片免费观看| 亚洲熟妇无码久久精品| 快穿攻略各种男主肉h| 亚洲啪av永久无码精品放毛片| 国产真实乱人偷精品视频| 狂性xxxx乱大交老女人| 口述他进我身体全过程| 一本大道无码人妻精品专区| 黑人巨大三根一起进| 欧美大屁股眼子xxxxx视频| 欧美精品久久久久a片18的试看| 日本片在线看的免费网站| 亚洲 欧美 自拍 另类 日韩| 公妇借种乱h日出水了|