国产裸体美女永久免费无遮挡,解开人妻的裙子猛烈进入,人世间电视剧免费观看全集完整版,波多野结衣在线视频

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿(mào)易試驗區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

沼氣凈化脫硫裝置的運行維護(hù)!

沼氣凈化裝置的運行維護(hù)應(yīng)符合下列規(guī)定:

The operation and maintenance of biogas purification device shall meet the following requirements:
1、應(yīng)定期排出脫水、脫硫裝置中的領(lǐng)凝水。當(dāng)室外溫度接近0℃時,應(yīng)每天排除冷凝水,排水時應(yīng)防止沼氣泄漏。
1. The condensate water in dehydration and desulfurization unit shall be discharged regularly. When the outdoor temperature is close to 0 ℃, the condensate water should be drained every day, and the leakage of biogas should be prevented during drainage.
2、生物脫硫啟動運行正常后,應(yīng)定期檢查脫硫前后硫化氫濃度變化,硫化氫去除率應(yīng)滿足后端工藝要求。當(dāng)發(fā)現(xiàn)脫硫效率明顯下降時,應(yīng)及時補(bǔ)充循環(huán)營養(yǎng)液。塔內(nèi)填料應(yīng)6-12個月清洗1次。
2. After the start-up and operation of biological desulfurization are normal, the change of hydrogen sulfide concentration before and after desulfurization should be checked regularly, and the hydrogen sulfide removal rate should meet the requirements of back-end process. When it is found that the desulfurization efficiency is obviously decreased, the circulating nutrient solution should be supplemented in time. The packing in the tower should be cleaned once every 6-12 months.
3、應(yīng)定期檢查干法脫硫塔前后硫化氫濃度、沼氣壓力變化,當(dāng)達(dá)不到設(shè)計要求時應(yīng)更換脫硫劑或進(jìn)行脫硫再生。
3. The change of hydrogen sulfide concentration and biogas pressure before and after the dry desulfurization tower should be checked regularly. When the design requirements are not met, the desulfurizer should be replaced or the desulfurization regeneration should be carried out.
                       沼氣脫硫
4、干法脫硫塔再生應(yīng)符合下列規(guī)定:
4. Regeneration of dry desulfurization tower shall meet the following requirements:
1).當(dāng)采用塔內(nèi)脫硫劑再生時,應(yīng)關(guān)閉沼氣進(jìn)出口閥,打開旁通管道和放散管路閥門。
1) When the desulfurizer in the tower is used for regeneration, the inlet and outlet valves of biogas should be closed, and the valves of bypass pipeline and discharge pipeline should be opened.
2).當(dāng)采用在線脫硫劑再生時,應(yīng)根據(jù)沼氣中硫化氫含量確定空氣摻混量及空氣流速,塔內(nèi)溫度應(yīng)低于70℃,脫硫塔出口處沼氣中氧含量應(yīng)小于1%;
2) When online desulfurizer regeneration is used, the air mixing amount and air flow rate should be determined according to the content of hydrogen sulfide in biogas. The temperature in the tower should be lower than 70 ℃, and the oxygen content in biogas at the outlet of desulfurization tower should be less than 1%;
3).脫硫劑進(jìn)行2次~3次再生后應(yīng)及時更換,更換脫硫劑時操作人員應(yīng)戴防毒面具,室內(nèi)應(yīng)進(jìn)行通風(fēng);
3) The desulfurizer should be replaced in time after 2 ~ 3 times of regeneration. When replacing the desulfurizer, the operators should wear gas masks, and the room should be ventilated;
4).廢脫硫劑的處置應(yīng)符合環(huán)境保護(hù)的要求。
4) The disposal of waste desulfurizer should meet the requirements of environmental protection.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
奇米综合四色77777久久麻豆| 最近中文字幕在线中文一页| 五月天中文字幕mv在线| 解开警花的裙子猛烈进入| 87福利电影网| 国产亚洲色婷婷久久99精品| 台湾三级| 麻豆app| 国产免费内射又粗又爽密桃视频| 国产精品久久久久无码av色戒| 精品国产伦一区二区三区在线观看| 久久久精品国产sm调教网站| 妈妈的朋友6| 欧美高清videossexo| 老板含着她的花蒂啃咬高潮的视频| 久久久久久国产精品免费免费| 久久99精品久久久久子伦| 人善交videos欧美| 夹得好湿真拔不出来了动态图| 国产chinese男男gay| 伊人久久大香线蕉综合75| 宿主每日被guan满的日常| 亚洲精品国偷拍自产在线观看蜜臀| 极品少妇hdxx麻豆hdxx| 最近免费中文字幕大全免费版视频| 中文字幕乱码人妻一区二区三区| 亚洲成av人片在www色猫咪| 女人张开腿让男人添| 男女作爱免费网站| 中文字幕乱码在线人视频| 双性美人被cao到崩溃h漫画| 久久精品国产亚洲av香蕉| 批日出水免费观看40分钟| 我们的日子电视剧免费观看完整版| 18gay男同69亚洲帅男蓝宇| 日韩精品毛片无码一区到三区| 国产偷抇久久精品a片69| 美女裸体啪啪到高潮无遮挡| 多男用舌头伺候一女| 久久精品国产网红主播| 久久日本片精品AAAAA国产|